Field Type: YELLOW
Manured / No Open Intakes

Yellow 1: 16 Acre drainage area, No open intakes.
95-100 foot tile spacing.
6” outlet (4” in field dumps into 6” submain)
Turkey Manure

Yellow 2: 26 Acre drainage area, No open intakes.
80 foot tile spacing.
15 “ outlet (below ravine)
Swine Manure

Yellow 3: 4 Acre drainage area, No open intakes.
50 foot tile spacing.
4” tile
Swine Manure

Yellow 4: 5 Acre drainage area, No open intakes.
50 foot tile spacing.
4” tile
Swine Manure

Spring Snowmelt

Summer Baseflow

Storm Event