Upper Cannon River Watershed

 



 

Project Overview Approach Tile Reinventory Project Findings Contact

Materials and Methods | Monitoring Equipment | Field Types | Project Timeline

Field Type Field Type: RED
No Manure / No Open Intakes

Orange 1: 12 Acre drainage area, No open intakes.
50 foot tile spacing.
4” tile
Non- Manure

Orange 2N1: 15.5 Acre drainage area, No open intakes.
80 foot tile spacing.
6” tile
Non- Manure

Orange 2N1: 15.5 Acre drainage area, No open intakes.
80 foot tile spacing.
6” tile
Non- Manure

Orange 3S1
: 16.4 Acre drainage area, No open intakes.
50 foot tile spacing.
4” tile
Non- Manure

Orange 3S2
: 16.4 Acre drainage area, No open intakes.
50 foot tile spacing.
4” tile
Non- Manure

 
 
 
 