Field Type: BLUE
No Manure/ With Open Intakes

Blue 1 (south): 23 acre drainage area, with open tile intakes.
80 and 100 foot tile spacing.
12” Main, 8”,6” laterals perforated plastic.

Blue 2 (north):
39 acre drainage area, WITH open tile intakes
100 foot tile spacing.
12” Main, 8”,6” laterals perforated plastic/concrete.

Blue 3:

25 Acre drainage area, WITH open tile intakes.
80 foot tile spacing.
6” Concrete, 5” laterals.

All Sites:
No manure history in the last ten years.
Corn/Soybean crop rotation