Start
Date
Start
Time
End
Date
End
Time
E. coli
(MPN/100 ml)
TSS
(mg/L)
TP
(mg/L)
PO4
(mg/L)
NO2+NO3
(mg/L)
Sample method
2008                  
4/11/2008 1130 4/11/2008 1130 0.27 0.197 13.1 grab
4/11/2008 1630 4/11/2008 1630 0.288 0.208 13 grab
4/24/2008 1609 4/28/2008 1146 0.035 0.021 11.3 intergrated
4/30/2008 0147 5/5/2008 1306 0.014 ND 11.1 intergrated
5/3/2008 1315 5/3/2008 1315 0.014 ND 10.8 grab
5/30/2008 1115 5/30/2008 1115 0.027 0.016 12.4 base grab
5/30/2008 1359 5/31/2008 1035 0.015 0.007 12.1 intergrated
5/31/2008 1556 6/2/2008 0316 ND ND 11.3 intergrated
6/5/2008 2040 6/6/2008 1249 0.026 0.011 13 intergrated
6/6/2008 1702 6/9/2008 0908 0.025 0.016 13.7 intergrated
6/9/2008 1211 6/12/2008 0718 0.01 0.006 13.1 intergrated
6/12/2008 1054 6/14/2008 1841 ND ND 13.3 intergrated
6/26/2008 1000 6/26/2008 1000 0.014 0.005 11.9 base grab
7/17/2008 1400 7/17/2008 1400 0.329 0.268 12.9 base grab
4/11/2008 ask bill 3.1
4/14/2008 13:15 < 1
4/25/2008 14:30 < 1
4/30/2008 10:30 < 1
5/30/2008 12:00 1
5/31/2008 12:30 < 1
6/2/2008 < 1 Composite
2009                  
3/23/2009 14:00 3/23/2009 14:00 0.216 0.139 10.8 Discrete Storm Grab
3/23/2009 12:00 3/23/2009 12:00 0.239 0.131 Discrete Storm Grab
3/23/2009 14:47 3/24/2009 1154 9.8 0.221 0.146 11.2 Integrated Flow Proportional -- Composite
3/24/2009 13:00 3/24/2009 13:00 10.8 0.161 0.106 11.9 Discrete Storm Grab
3/24/2009 13:11 3/25/2009 08:50 0.14 0.088 12.2 Integrated Flow Proportional -- Composite
3/27/2009 16:00 3/27/2009 16:00 0.028 0.015 13 Discrete Storm Grab
4/16/2009 13:30 4/16/2009 13:30 0.014 0.009 12.9 Base Flow Grab
4/29/2009 10:00 4/29/2009 10:00 0.012 0.007 11.9 Base Flow Grab
5/5/2009 11:30 5/5/2009 11:30 ND 0.007 12.3 Base Flow Grab
5/13/2009 10:30 5/13/2009 10:30 0.014 0.006 12.9 Base Flow Grab
6/8/2009 10:50 6/8/2009 10:50 < 1 0.029 0.011 12.4 Discrete Storm Grab
6/8/2009 5:49 6/9/2009 13:00 0.023 0.013 12.5 Integrated Flow Proportional -- Composite
6/25/2009 14:00 6/25/2009 14:00 0.015 0.009 12.2 Base Flow Grab
7/15/2009 15:00 7/15/2009 15:00 0.016 0.008 11.9 Base Flow Grab
10/30/2009 12:45 10/30/2009 12:45 0.077 0.056 8.23 Discrete Storm Grab
11/13/2009 12:35 11/13/2009 12:35 0.012 0.008 12.1 Base Flow Grab
11/24/2009 15:15 11/24/2009 15:15 0.11 0.1 10.7 Discrete Storm Grab
11/30/2009 13:45 11/30/2009 13:45 0.018 0.013 12.1 Discrete Storm Grab
2010                  
3/10/2010 17:15 3/10/2010 0.112 0.06 9.77 SF
3/12/2010 9:30 3/12/2010 0.229 0.19 7.06 SF
3/12/2010 12:31 3/15/2010 0.266 0.189 7.28 SF
3/15/2010 18:19 3/17/2010 0.078 0.06 10 SF
3/17/2010 17:17 3/20/2010 0.03 0.006 10.9 SF
3/22/2010 14:30 3/22/2010 0.019 ND 10 SF
4/27/2010 13:30 4/27/2010 0.018 0.017 8.66 BF
1/0/1900 15:45 5/11/2010 1 0.021 0.008 10.8 SF
5/13/2010 10:30 5/13/2010 1 0.024 0.013 11.8 SF
5/13/2010 11:03 5/17/2010 0.014 ND 11.3 SF
6/8/2010 13:40 6/8/2010 0.018 0.014 10.8 BF
6/8/2010 22:15 6/11/2010 0.02 0.007 12.2 SF
6/11/2010 12:30 6/14/2010 0.017 0.007 11.8 SF
6/17/2010 18:14 6/18/2010 0.085 0.024 15.6 SF
6/18/2010 13:04 6/19/2010 60.9 0.023 0.006 13.9 SF
6/25/2010 18:58 6/27/2010 0.101 0.035 13.6 SF
6/27/2010 19:59 6/29/2010 0.021 0.006 12.9 SF
7/2/2010 16:15 7/2/2010 0.022 0.019 12.8 BF
9/16/2010 17:47 9/17/2010 0.052 0.013 7.87 SF
9/22/2010 18:30 9/23/2010 0.145 0.032 5 SF
9/23/2010 11:17 9/24/2010 0.148 0.028 5.63 SF
9/24/2010 14:38 9/27/2010 0.052 0.011 8.11 SF
10/5/2010 13:50 10/5/2010 0.02 0.01 8.37 BF
N TP op 
9.77 0.112 0.06
7.06 0.229 0.19
7.28 0.266 0.189
10 0.078 0.06
10.9 0.03 0.006
10 0.019 ND
8.66 0.018 0.017
10.8 0.021 0.008
11.8 0.024 0.013
11.3 0.014 ND
10.8 0.018 0.014
12.2 0.02 0.007
11.8 0.017 0.007
15.6 0.085 0.024
13.9 0.023 0.006
13.6 0.101 0.035
12.9 0.021 0.006
12.8 0.022 0.019
7.87 0.052 0.013
5 0.145 0.032 19
5.63 0.148 0.028 9.6
8.11 0.052 0.011
8.37 0.02 0.01