Start
Date
Start
Time
End
Date
End
Time
E. coli
(MPN/100 ml)
TSS
(mg/L)
TP
(mg/L)
PO4
(mg/L)
NO2+NO3
(mg/L)
Sample method
2008                  
4/11/2008 1130 4/11/2008 1130 0.221 0.176 11.3 grab
4/11/2008 1203 4/14/2008 1232 0.151 0.106 9.26 intergrated
4/11/2008 1630 4/11/2008 1630 0.243 0.196 11.1 grab
4/24/2008 1926 4/28/2008 1253 0.015 0.006 7.68 intergrated
4/30/2008 0748 5/5/2008 0835 0.011 ND 7.87
5/3/2008 1315 5/3/2008 1315 0.012 0.006 8.07
5/30/2008 1115 5/30/2008 1115 0.021 0.01 9.42 Base grab
5/30/2008 1259 5/31/2008 1156 0.012 0.005 9.14 intergrated
5/31/2008 1523 6/2/2008 0645 0.016 ND 8.63 intergrated
6/5/2008 1908 6/6/2008 1009 0.023 0.009 10.1 intergrated
6/6/2008 1622 6/9/2008 0827 0.023 0.01 10.4 intergrated
6/9/2008 1115 6/12/2008 0933 0.01 ND 10.7 intergrated
6/12/2008 1211 6/15/2008 0303 ND ND 10.8 intergrated
6/26/2008 1000 6/26/2008 1000 0.012 0.006 9.62 Base grab
7/17/2008 1400 7/17/2008 1400 0.037 0.02 9.22 Base grab
4/14/2008 13:15 1
4/25/2008 14:30 < 1
4/30/2008 10:30 < 1
5/30/2008 12:00 < 1
5/31/2008 12:30 < 1
6/2/2008 < 1 Composite
6/12/2008 11:00 < 1
2009                  
3/20/2009 14:00 3/20/2009 14:00 0.151 0.115 4.03 Discrete Storm Grab
3/23/2009 14:00 3/23/2009 14:00 0.178 0.122 7.62 Discrete Storm Grab
3/23/2009 12:00 3/23/2009 12:00 0.178 0.108 Discrete Storm Grab
3/23/2009 14:47 3/24/2009 6:04 0.197 0.14 8.71 Integrated Flow Proportional -- Composite
3/24/2009 13:00 3/24/2009 13:00 0.194 0.138 8.84 Discrete Storm Grab
3/24/2009 13:17 3/26/2009 23:03 0.11 0.057 9.32 Integrated Flow Proportional -- Composite
3/27/2009 16:00 3/27/2009 16:00 0.035 0.021 7.88 Discrete Storm Grab
4/16/2009 13:30 4/16/2009 13:30 0.017 0.012 9.48 Base Flow Grab
4/29/2009 10:00 4/29/2009 10:00 ND 0.009 10 Base Flow Grab
5/5/2009 11:30 5/5/2009 11:30 0.012 0.009 8.08 Base Flow Grab
5/13/2009 10:30 5/13/2009 10:30 0.017 0.007 10.2 Base Flow Grab
6/8/2009 10:50 6/8/2009 10:50 1 0.028 0.014 11.6 Discrete Storm Grab
6/8/2009 5:56 6/9/2009 9:45 0.026 0.012 11.5 Integrated Flow Proportional -- Composite
6/25/2009 14:00 6/25/2009 14:00 ND 0.008 8.96 Base Flow Grab
7/15/2009 15:00 7/15/2009 15:00 0.014 0.009 9.63 Base Flow Grab
10/26/2009 11:00 10/26/2009 15:00 0.013 0.005 10.1 Base Flow Grab
10/30/2009 12:45 10/30/2009 12:45 0.018 0.011 10.2 Discrete Storm Grab
11/13/2009 12:35 11/13/2009 12:35 0.012 0.009 9.73 Base Flow Grab
11/24/2009 15:15 11/24/2009 15:15 0.133 0.116 9.24 Discrete Storm Grab
11/30/2009 13:45 11/30/2009 13:45 0.018 0.011 9.46 Discrete Storm Grab
2010                  
3/10/2010 17:15 3/10/2010 0.185 0.143 8.05 SF
3/12/2010 9:30 3/12/2010 0.33 0.268 4.61 SF
3/10/2010 17:30 3/12/2010 0.36 0.274 5.87 SF
3/12/2010 13:50 3/15/2010 0.595 0.465 4.87 SF
3/15/2010 17:00 3/17/2010 0.204 0.151 7.41 SF
3/17/2010 15:51 3/22/2010 0.037 0.013 8.78 SF
3/22/2010 14:30 3/22/2010 0.021 0.008 8.65 SF
4/27/2010 13:30 4/27/2010 0.016 0.016 8.03 BF
5/11/2010 15:45 5/11/2010 1 0.023 0.013 8.7 SF
5/11/2010 15:01 5/13/2010 1 0.018 0.007 8.78 SF
5/13/2010 12:14 5/17/2010 0.013 ND 18 SF
6/8/2010 13:40 6/8/2010 0.016 0.014 9.18 BF
6/11/2010 10:30 6/11/2010 0.033 0.02 11 SF
6/11/2010 11:08 6/14/2010 0.01 ND 10.2 SF
6/17/2010 18:13 6/18/2010 0.125 0.046 17.8 SF
6/18/2010 12:40 6/20/2010 18.5 0.072 0.027 13.2 SF
6/25/2010 19:03 6/27/2010 0.159 0.066 13.9 SF
7/2/2010 16:15 7/2/2010 0.025 0.021 12.1 BF
9/16/2010 17:38 9/17/2010 0.019 0.007 7.99 SF
9/22/2010 19:00 9/23/2010 0.119 0.037 6.04 SF
9/23/2010 11:28 9/24/2010 0.21 0.085 4.44 SF
9/24/2010 13:52 9/27/2010 0.127 0.039 5.56 SF
10/5/2010 13:50 10/5/2010 0.018 0.007 10.2 BF